High-Pressure Misting System
25° Cooler than your neighbor’s yard
Servicing the Valley for 20 Years.
CONTRACTORS
Misting for pre build and existing structures
- Contact us for estimates, we can do a site visit or submit an estimate from your CAD drawings
Pre build (under stucco)
- Estimate and installation during framing
- Installation should be performed before scaffolding and lathe
- Once installation is completed, we will pressure test the system past operating pressure
- Stub out for electrical, water should be on the side of the house at the contractors discretion
- Usually near air-conditioning unit, pool equipment or utility room
Plumbing
- ½” thread, brass ball valve at pump location
- Soft water is always beneficial. But not imperative
- 3 Stage calcium/ carbon available
- We have Larger filtering units for commercial projects.
Electrical
- 110 volt, 15-20 amp
- Dedicated circuit at pump location (Amperage depends on size of pump, 220 V on large systems.)
- on/off switch
- Light switch next to lights and ceiling fans or house automation. Remote switches are available.
Existing structures or remodel
- Electrical and plumbing requirements
- Pump location
- Length of patio or pergola
- Pool or layout areas
- Color of structure
- Sleeving under sidewalks, pavers or turf
After the contractor leaves
- Kendall Misting will provide a biannual service for the customers
- Spring start up and fall shut down. Will increase customers warranty from two years to five years